Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EQUIPMENT MOEI LI2ATION / DEMOBILIZATION <br />Task p... 6 Prep. by <br />____________ SD Filename..M043-6 <br />________ __________ <br />Date..... 19-Jul-97 Perm rc # <br />____________ M-65-043 Mrne......Red Canyon Quarry <br />________ _______________________ <br />________________ <br />_________________ <br />__________ <br />Perm is Ac[ron........ Phased Reclamation <br />___________________________________________________ <br />________________ <br />_________________ <br />__________ <br />Task Description..... Mob/demob Egu rpment <br />___________________________________________________ <br />_______________ <br />__________________ <br />__________ <br />HOURLY EQUIPMENT COST <br />_____________________ NOTE - This is a list [o select from, no[ a list of mandatory items co incl ude. <br />Mob/Demob Egp. -T rac[or : 6x4, ]5,000 16 GVW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck, drop deck <br />-Med. Trailer 50 [on folding gooseneck, drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />Pilot Car On-highway 11ghc duty truck, 9x2, 130 hp, 1/2 [on racing, gasoline powered <br />-Hyd. Crane Grove RTSBD rough terrain hydraulic crane, 20 con capacity, 125 hp, 6D ft. boom <br />-Fuel Truck 6x9, 3,600 gallon capacity, 210 HP, diesel powered <br />-Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br />-Fla [bed Truck: 20,000 lb GVW, 175 HP, dyes el powered <br />Last Uptlate: __________________________________________ _______________ __________________ __________ <br />December, 1999 <br />_"'"'--'--""" Lt. Rig Med.Rig Hvy.Rrg Pilo[ Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. ~ 50 T. Car Crane Truck Truck Truck <br />Ownership Cos[/ht = $27.99 $31.23 538.36 $1.81 $19.89 $6.95 512.79 55.71 <br />Operating Cos[/hr = $26.89 529.29 539.27 55.12 $23.40 $18.53 $29.52 $8.00 <br />Operator Cos[/hr = $21.40 $22.03 522.03 521.29 520.86 521.24 $Z 1.24 521.24 <br />Helper Cost/hr = $20.60 521.29 $21.29 $0.00 50.00 50.00 50.00 $0.00 <br />Total = 596.72 5307.79 5115.90 528.17 564.15 $96.72 $58.55 534.95 <br />NON-ROADABLE EQUIPMENT: <br />---"""""'----'"""""- Weight Ownership Haul Rig Fleet S ize Haul Trip Return Trip DOT Permit <br />Machine Description (cans) Cos[/hr Cost/hr (no. hau led) Cosc/hr Cost/hr Cost/ea <br />Cat DBN 36.00 540.32 5103.79 1 5149.11 5103.79 <br />Loader 4 Seeding Equipme n[ 25.00 538.14 $96.72 1 $134.86 596.72 <br />Scraper 623E 20.00 $43.19 596.72 1 51]9.91 596.72 <br />Subto[a is $418.88 $297.23 $0.00 <br />_________ _________ _________ <br />