My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-31_REVISION - M1998059
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998059
>
2004-12-31_REVISION - M1998059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:42 PM
Creation date
11/22/2007 12:33:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998059
IBM Index Class Name
Revision
Doc Date
12/31/2004
Doc Name
Cost Summary Form
From
DMG
To
File
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 12/31/2004 <br />User : KAP <br />State :Colorado PermiUob# :M-1998-059 <br />County :Phillips Abbreviation :none <br />Site :Sunny Dale Farm Pit Filename : M059-003 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : TR <br />Task description :Spread TopSOil <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br />Operating cosUhour : $66.09 100 <br />Ripper op. cosUhour : $2,13 30 <br />Operator cosUhour : $31.76 NA <br />Total unit cost hour : $148.80 Total fleet cosUhour : $148.80 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 20,166 CCY factor : 1.215 volume : 24,502 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Top Soil <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 5.00 <br />Average site altitude : 4,000 fei <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.219 /LCY <br />Condition Correction Factors Source <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (lshift/dal <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 1.00 (Cat Hl3) <br />Material weight : 1.44 (Cat HB} <br />Blade type : 1.00 (S/SU/UJ <br />Net correction : 0.80 <br /> <br />Adjusted unit production : 680.55 LCY/hr <br />Adjusted fleet production : 680.55 LCY/hr <br />Total job time : 36.00 Hours <br />Total job cost : $5,357 <br />
The URL can be used to link to this page
Your browser does not support the video tag.