Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : 002 <br />Date : 12/31/2004 <br />User : KAP <br />State :Colorado <br />County :Phillips <br />Site :Sunny Date Farm <br />Permitfjob# : M-1998-059 <br />Abbreviation :none <br />Filename :M059-002 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action : TR <br />Task description :Grade Highwalls <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11- 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> Operatingcost/hour : $66.09 100 <br /> Ripper op. cosUhour : $2.13 30 <br /> Operator cosVhour : $31.76 NA <br /> Total unit cosUhour : $148.80 Total Fleet cosUhour : $148.80 <br />:: <br /> <br />MATERIAL QUANTITIES ;: <br />.. <br />, >: :: <br />Initial Swell Loose <br />volume : 13, 200 BCY factor : 1.250 volume : 16, 500 LCY <br />Source of estimated volume :Reclamation Plan <br />Source of estimated swell factor :Packed Earth <br />Job Condition Correction Factors <br />Average push distance : 55 feet <br />Unadjusted hourly production : 1,323.4 LCY/hr <br />Material consistency description <br />Compacted ~lI or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />10.00 % (r <br />4,000 feet <br />2,550 Ibs/LCY <br />Operator skill <br />Material consistency :_ <br />Dozing method :_ <br />Visibility <br />Job efficiency :_ <br />Spoil pile :_ <br />Push gradient: <br />Altitude :_ <br />Material weight <br />Blade type :`_ <br />Net correction <br />JOB 71ME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.227 /LCY <br />Horsepower: 310 <br />Source <br />0.75 <br />0.90 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.22 <br />1.00 <br />0.90 <br />1.00 <br />0.50 <br />Adjusted unit production : 655.37 LCY/hr <br />Adjusted Flee[ production : 655.37 LCY/hr <br />Total job time : 25.18 Hours <br />Total job cost : $3, 746 <br />