My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99920
DRMS
>
Back File Migration
>
Revision
>
REV99920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:43 AM
Creation date
11/22/2007 12:31:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
4/11/1994
Doc Name
BORROW AREA TR 17 FN C-81-041
From
POWDERHORN COAL CO
To
DMG
Type & Sequence
TR17
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Erica Crosby <br />April 8, 1994 <br />Page Three <br />21. CBA 2 drainage east of channel - Page 171f has been <br />revised to discuss drainage east of the Coal Gulch <br />drainage channel. There will be minimal disturbance <br />along this side, usually less than a 10' wide strip. <br />The rip rap will act as a rock filter also. <br />22. Particle size distribution for sedcad calculations - I <br />discussed this with Susan. She agreed to allow the <br />current numbers in the calculation, therefore, no <br />revisions have been made. <br />23. CBA-2 east collection ditch capacity - Runoff flowing <br />into the east collection ditch covers approximately <br />from 7.5 acres. Runoff from the remaining area flows <br />overland directly into the pond. No revisions have <br />been made. <br />24. CDPS permit changes - Prior to installation of pond 11 <br />in the new location, a revision will be made in our <br />CDPS permit. <br />25. CBA-2 ditch cross-section - The cross-section was <br />located on page WW-33. Page 169a has been revised to <br />note the location. <br />26. Pond 11 emergency spilling elevation - The spillway <br />will be located at 4869.4'. Pages WW-5B and WW-6 have <br />been revised to correspond with this elevation. <br />27. Pond 11 maintenance - Page 173 has been revised to <br />provide for sediment and water removal. The statement <br />that "There must be adequate storage so that no runoff <br />from a storm event less than the 25 year-24 hour would <br />pass through the emergency spillway" appears to be in <br />error. Storage for a 10 year-24 hour event will be <br />certified upon construction. <br />One additional item discussed during the last field inspection <br />was a minor boundary adjustment to topsoil salvage area 3 shown <br />on Exhibit 9B. A little less than .5 acres was added to this <br />area to eliminate a steep bank left from the previous topsoil <br />removal. Exhibit 9B has been revised to show the added area and <br />page 178b has been revised to discuss the change. <br />Page 178c has not been revised but information from page 178b has <br />been extended onto this page. Please let me know if you have any <br />further questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.