My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-10_REVISION - M1977247 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977247
>
1997-09-10_REVISION - M1977247 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 8:14:16 AM
Creation date
11/22/2007 12:30:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977247
IBM Index Class Name
REVISION
Doc Date
9/10/1997
Doc Name
AMENDMENT APPLICATION AND EXHIBITS
From
GP-Gypsum
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />YEAR 1999 <br />TASK # 1-- Gold Hi1UCeinture Hill HighwalUMine Bench Removal-- Drilling and blasting of <br />app. 95400 tons of gypsum, bulldoze 12000 tons to reduce existing highwalUmine bench to 1: <br />rock talus slope. <br />TASK #2-- Senatore Hill/hangingwall contact highwall removal--Drilling and blasting of app. <br />36500 tons, 2500 tons bulldozer to reduce highwall to 1:1 rock talus slope. <br />TASK #3--Zinc Hill highwall Removal--Drill and Blast 25400 tons, bulldoze 1000 tons to <br />remove vertical highwall to l:l talus slope. <br />TASK #4-- Revegetation work on waste dumps, roadways, Maintenance on south End Titanium <br />Hill work performed in 1997. <br />YEAR 2000 <br />TASK # 1--Copper Hill Highwall Removal--Drill and blast app. 200000 tons and bulldoze app. <br />20000 tons to reduce highwall to 1:1 rock talus slope. <br />TASK #2-- Hangingwall highwall reduction--Bulldoze app. 84000 tons of hangingwall material <br />to reduce existing highwall contact to 1:1 rock talus slope from just above crusher bin to north <br />end of ore deposit, 2800' northwest. <br />TASK #3-- Revegetation maintenance and continuance, site wide. <br />TASK #4--Crusher equipment remova{, road removal and revegetation. <br />YEAR 2001 <br />TASK #1-- Completion of Copper Hill Highwall removal and grading to 1:1 rock talus slope. <br />Drill and blast app. 137000 tons of rock, bulldoze app. 5000 tons to complete task started in <br />1999. <br />TASK #2-- 5tormwater Management final configuration in crusher site area, including burial of <br />concrete structures, removal or regrading of gypsum stockpiles, and construction of final <br />sediment pond berm and storm ditches ceded. <br />TASK #3-- Haul planting medium as necessary to flat mine bench areas not covered in rock <br />talus. Revegetate via grass, legume, and shrub seeding, mulching applications, etc. <br />TASK #4-- Sitewide revegetation maintenance and continuance in most recent reclaimed areas. <br />TASK #5--Buildings removal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.