My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99652
DRMS
>
Back File Migration
>
Revision
>
REV99652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:30 AM
Creation date
11/22/2007 12:29:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980246
IBM Index Class Name
Revision
Doc Date
8/4/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i ~ <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - BULLDOZER WORK <br />Task #: 3a Prep. by: TDG Task File Name: M246-3a <br />Date: 08/04/95 Permit #:M-80.246 Mine: Zellitti Pit <br />Permit Action: Conversion application <br />Task Description: Place 1 ft. layer of soil mat. over orig. 9.5 acre site <br />HOURLY EpUIPMENT COST <br /> Basic Machine: Cat D8N Horsepower: 285 <br /> Blade Type: SEMI-UNIVERSAL <br /> Attachment #1: ROPS Cab Shift Basis: 1/day <br /> Attachment #2: 3-shank ripper ----- <br />Cost Breakdown: <br />-------- Utilization X <br />Ownership cost/hr = 546.40 N/A <br />Operating 8 overhau l cost/hr- dozer = 551.67 100 <br /> -ripper = 50.00 0 <br />Operator cost/hr = 522.95 N/A <br />Total egpt. unit cost/hr = 5121.02 Total fleet cost/hr: 5121.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 15.327.0 LCY Factor: N/A Volume: 15,327.0 LCY <br />Source of quantity take-off: Assume 1 ac.ft./acre over 9.5 acre area <br />Source of est. swell factor: NA <br />HOURLY PRODUCTION <br /> <br /> Job Condition Correction Factors <br />A <br />h di <br />t 200 f - <br />-- - <br />vg. pus <br />s <br />ance: t. - <br />-- <br />- - <br /> ---- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Hat. consistency.. 1.10 (Cat tbl) <br />dozer production: 448 LCY/hr Dozing method..... 1.00 (gen.) <br /> ------- Visibility........ 1.00 (avg.) <br />Material consistency : Job efficiency.... 0.83 (lsh/day) <br />Partly consolidated stockpile Spoil pile factor. 0.70 (fnd-mf) <br />-------------- ------ Push gradient..... 1.22 (Cat tbl) <br />Avg. push gradient: 10.00 X (neg) Altitude deration. 1.00 (Cat tbl) <br /> - Material weight... 1.10 (Cat tbl) <br />Avg. site altitude: 6500 ft. Blade type........ 1.00 (S,SU.U) <br />Material weight 2100.00 lb/LCY Net Job Correction 0.64 <br />Mat. Descr.: - ------- <br />Earth - Loam Adjusted Unit Prod.: 288.03 LCY/hr <br /> Adjus ted Fleet Production: 288.03 LCY/hr <br />JOB COST - <br />Fleet size 1 Dozers) Total Job Time: 53.21 Hours <br />Unit Lost 50.420 /LCY Total Job Cost : 56,439.97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.