Laserfiche WebLink
Colorado Division of Minerals and Geology <br />ESTIMATING FORM ~ BULLDOZER WORK <br />Task #: 2b Prep. by: TDG Task File Name: M246~2b <br />Date: 08/04/95 Permit #:M ~80-246 Mine: Zellitti Pit <br />Permit Action: Conversion application ` <br />Task Description: Regrade pit floor remaining in 3 acre phased pit area <br />HOURLY EQUTPMENT COST <br />Basic Machine: Cat D8N Horsepower: 285 <br />81 ade Type: SEMI~UNIVERSAL -------- <br />Attac hment #1: ROPS Cab Shift Basis: 1/day <br />Attac hment #2: 3-shank ripper ------- <br />Cost Breakdown: <br />-------- Utilization X <br />Ownership cost/hr = (46.40 N/A <br />Operating 8 overhaul cost/h r- dozer = f51.61 100 <br /> ripper = f3.34 50 <br />Operator cast/hr f22.95 N/A <br />Total egpt. unit cost/hr = f124.36 Total fleet cost/hr : f124.36 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Volume: 3.469.0 LCY Factor: N/A Volume: 3.469.0 LCY <br />Source of quantity take-off: Assume 1 ac.ft./acre over 2.15 acre area <br />Source of est. swell factor: NA - <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />A <br />h di <br />50 f - <br />vg. pus <br />stance: t. -------- - <br />---- - Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 0.90 (Cat tbl) <br />dozer production: 1180 LCY/hr Dozing method..... 1.00 (gen.) <br />------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1 sh/day) <br />Compacted fill or embankment Spoil pile factor. 0.70 (fnd-mf) <br />------------------------ --- Push gradient..... 1.00 (Cat tbl ) <br />Avg. push gradient: 0.00 X (pos) Altitude deration. 1.00 (Cat tbl) <br />---- - Material weight... 0.79 (Cat tbl) <br />Avg. site altitude: 6500 ft. Blade type........ 1.00 (S.SU.U) <br />Material weight 2900.00 lb/LCY Net Job Correction 0.31 <br />Mat. Descr.: - -- <br />Decomposed rock - SOX Rock. SOX Earth Adjusted Unit Prod.: 366.13 LCY/hr <br />- Adjusted Fleet Production: 366.73 LCY/hr <br />JOB COST <br />Fleet size 1 Dozers) Total Job Time: 9.46 Hours <br />Unit Cost f0.339 /LCY Total Job Cost: f1.176.37 <br />