Laserfiche WebLink
<br />RECLAMATION GOST SUHMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Description I Cost (f) <br />I-- - -I -- <br />No such work required I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No.l Task Description <br />----I------------------------- <br />I No such work required <br />I <br />I <br />I <br />I Cost (f) <br />I <br />I <br />I <br />I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. <br />- <br />- Task Description I Cost (f) <br />- I - -- ---- I ~- <br />I <br />4 <br />Demolition I <br />Garbage: assume 20'* 10'* 5' @ 5.18/cf <br />S1B0 <br />Sa 8 5b I Seeding Per attached worksheets (4.174 <br />I Fencing No such work required I <br />6 I Mob/Demob Per attached worksheet I 5842 <br />Subtotal (M): 55.196 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 523.825 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l item Description I Cost (f) <br />---I--- ----------------"---I---------- <br />1. I Public Liability Insurance.... 1.550% of dir. 5369 <br />2. I Contractor's Performance Bond 0.915% of dir. 5232 <br />3. I Contractor's Profit........... 10.00% of dir. I 52.382 <br />4. I Job Superintendent..Egp. Op. serves as super. f0 <br />Subtotal (A): 52.984 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 526.809 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description I Lost (f) <br />--I --_-I <br />I I <br />1. Minerals Program Admin. Fee at 5.00% of Intr. 51.340 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): 51.340 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through 8): 54.324 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 528.149 <br />