Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description I Cost (f) <br />I No such work required l <br />I I <br />I I <br />I I <br />Subtotal (H): <br />I. EARTHWORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description I Cost (S) <br />----I----------------------------- I--------- <br />I No such work required i <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I i <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />Subtotal (I): <br />J. EARTHWORK TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description Cost (f) <br />-----I -- ---------- I------ <br />3a I Place 1 ft. layer of soil over orig. 9.5 ac. areal f6,440 <br />3b l Place 1 ft. layer of soil over 3.0 ac. phased pitl 52,034 <br />l I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />Subtotal (J): f8.474 <br />