Laserfiche WebLink
<br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Eqp. <br />Cast/hr <br /> <br />Fleet Size Haul Trip <br />(no. hauled) Cost/hr <br />sheet 2 of 2 <br />Return Trip <br />Cost/hr <br />Flatbed Truck <br />534.95 <br />1 534.95 534.95 <br />MOB/DEMOB SUPPORT EQUIPMENT: <br />Non-Roadable Eqp. Description <br />Weight Ownership Haul Rig <br />(tons) Cost/hr Cost/hr <br />Subtotals 534.95 <br />Fleet Size Haul Trip <br />(no. hauled) Cost/hr <br />534.95 <br />Return Trip DOT Permit <br />Cost/hr Cost/ea <br /> Subtotals 50.00 50.00 50.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals <br />EQUIPMENT HAUL DISTANCE d TIME <br />Nearest major city or town within project area region: Durango <br />Total one way travel distance = 10.0 miles. Average travel speed = <br />Job Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= <br />0.33 hours haul <br />0.50 hours unload <br />0.33 hours return <br />JOB COST <br />Total Mob/Demob Cost = 5842.07 <br />so.oo so.DD <br />30.00 mph. <br />N/A hours load <br />0.33 hours haul <br />N/A hours unload <br />0.33 hours return <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />