Laserfiche WebLink
<br /> <br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - EQUIPMENT MOBILIZATION / DEM08I LI ZATION <br />Task #... 6 Prep. by TDG Filename..M246.6 <br />Date..... 04-Aug-95 Permit # M-80-246 Mine......Zellitti Pit <br />Permit Action........ Conversion application <br />Task Description..... Haul reclamation equipment to 8 from job site <br />HOURLY EQUIPMENT COST <br />NOTE - This is a list to select from, not a list of mandatory items to include. <br />Mob/Demob Eqp. -Tractor 6x4. 75,000 lb GVW, 375 HP, diesel powered <br />-Lt. Trailer 25 ton folding gooseneck. drop deck <br />-Med. Trailer 50 ton folding gooseneck. drop deck <br />-HVy. Trailer 120 Ton folding gooseneck, drop deck <br />-Pilot Car On-highway light duty truck. 4x2, 130 hp, 1/2 ton rating, gasoline powered <br />-Hyd. Crane Grove RT58D rough terrain hydraulic crane. 20 ton capacity. 125 hp. 60 ft. boom <br />-Fuel Truck 6x4. 3.600 gallon capacity. 210 HP, diesel powered <br />-Cube Truck :6x4. 2.500 gallon capacity, 210 HP, diesel powered <br />-Flatbed Truck: 20.000 lb GVW, 175 HP, diesel powered <br />Last Update: <br />December. 1994 <br />- <br />Cost Breakdown: <br /> <br />Lt. Rig <br /><=25 T. - <br /> <br />Med. Rig <br />26-50 T. <br /> <br />Hvy.Rig <br />> 50 T. ---- <br /> <br />Pilot <br />Car ----- <br /> <br />Hydraulic <br />Crane - <br /> <br />Fuel <br />Truck ------- <br /> <br />Lube <br />Truck -- <br /> <br />Flatbed <br />Truck <br />Ownership Cost/hr = 521.88 531.23 538.36 51.81 519.89 56.95 512.79 55.71 <br />Operating Cost/hr = 526.84 529.29 534.27 55.12 523.40 518.53 524.52 58.00 <br />Operator Cost/hr = 521.40 522.03 522.03 521.24 520.86 521.24 521.24 521.24 <br />Helper Cost/hr = 520.60 521.24 521.24 50.00 50.00 50.00 50.00 50.00 <br />Total = 596.72 5103.79 5115.90 528.17 564.15 546.72 558.55 534.95 <br />NON~ROADABLE EQUIPMENT : - <br />------------ Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />CAT DBN Dozer w/ripper 39.50 546.40 5103.79 1 5150.19 3103.79 <br />Revegetation equipment 10.00 510.00 596.72 1 5106.72 596.72 <br />sheet 1 of 2 <br />Subtotals 5256.91 (200.51 50.00 <br />