Laserfiche WebLink
t <br />.' Bowie Resources, Limited, Paonia, Colorado <br />1997 Pumping stations, pipeline, tanks, substation, and water treating. <br />1999 Installed a mine ventilation fan at the Bowie #2 mine site. The work included the fabri- <br />cation and erection of the fan ducting and evase, all the mechanical and electrical work. <br />1999 Increased the capacity of the load out facility from 400 TPH to 1000 TPH. The work <br />included all pulley changes, motor and geazbox changeouts, modifying the belt chutes, <br />the installation of two 500 TPH Jeffrey vibratory feeders, and all necessary electrical <br />work. <br />1999 Manufactured and erected an overland truss that enlazged the size of the mine's belting <br />to 60" wide to enable them to handle longwall production. The work also included all <br />concrete, mechanical, and electrical necessary for the upgrade. <br />Wold Trona, Golden, Colorado <br />1999 Constructed a scale version of a fully functional Trona process facility. The work in- <br />cluded all structural, piping, electrical, instrumentation, and pre-commissioning of the <br />pilot facility. <br />2001 Disassembled scaled version of fully functional Trona process facility, moved it to an- <br />other location and re-erected it. <br />Frontier-Kemper Constructors, Inc., Somerset, Colorado <br />1998-9 Erected two 12' diameter, 2500 HP mine ventilation fans. The work included the fabri- <br />cation of all the ducting and buildings as well as all mechanical and electrical work. <br />Con-Sy, Inc., Somerset, Colorado <br />1998 Mine water pumping facility including steel building and all electrical work. <br />H. W. Houston Constructors, Montrose, Colorado <br />1996-8 Construction of electrical portion of the Montrose County Justice Center. The work in- <br />cluded $1.2 million of electrical, security, and fire systems for the court building, sher- <br />iff's building, and a 198-bed facility. <br />13 <br />