Laserfiche WebLink
Tri-State Generation, Fraser, Colorado <br />•.1998 Constructed a 1000 square foot building including all concrete, erection of the self- <br />] framing Pazkline building, and electrical work. <br />US Filter/HPD Products, Meeker, Colorado <br />1999 Designed and manufactured six 17'-10" ID x 43'-4" straight side, cazbon steel product <br />silos. <br />Powderhorn Coal Company, Palisade, Colorado <br />1998 Prepazation plant upgrade including the installation of two sizing screens, conveyors, <br />and all corresponding mechanical and electrical work. <br />Cripple Creek & Victor Gold Mining Company, Victor, Colorado <br />1994 Supplied and erected process facility, MCC buildings, truck wash, and oil skimmer <br />building. Also constructed tank farm, refueling station, lunch room, and offices. <br />1998-9 Pump raise of the mine's barren solution lines. The pumps were raised 40 feet on three <br />separate lifts to accommodate the increase in the tailings pile. <br />1999 Constructed the Barren/Enrichment Facility addition. The work included excavation, <br />700 cubic yazds of concrete, over 40001ineaz feet of cazbon steel and HDPE pipe, and <br />all electrical and instrumentation. <br />Oxbow Mining, Inc., Somerset, Colorado <br />1997-8 Design built a 3500 TPH surface coal handling facility. The work included a 100 TPM <br />Kanawha batch weigh train loadout, HSS sample system, screening building, reclaim <br />tunnel, two concrete stack tubes, overland conveyor, offices, and wazehouse building. <br />2002 Construction of a state of the art, high tension, 60" coal handling system. The work in- <br />cluded drilling of 8' x 60' to 100'+ pier foundations for the 42", 4', 5', and 6' pipe <br />bents. The conveyor consisted of eight gallery trusses measuring 1600' set on the bents <br />and 1300' of underground and overland conveyor. The conveyor is powered with a 3 x <br />400 hp two-pulley drive temunal and will run 4000 TPH of mine coal. <br />i~ <br />~z <br />