Laserfiche WebLink
j Continental Conveyor Company <br />1992 Manufactured two high-angle conveyors, installed in the West Elk Mine. <br />1993 Manufactured ahigh-angle conveyor and delivered it to Newmont Gold in Elko, Ne- <br />vada. <br />Con-Sy, Inc., Somerset, Colorado <br />1998-9 Supplied and erected a 2240 square foot pre-engineered metal building including all <br />electrical work for the facility. <br />West Ridge Resources, Inc., East Carbon, Utah <br />1999-0 Grass roots surface coal handling facility including all fabrication, erection, mechani- <br />cal, and electrical work. The work included an overland conveyor, reclaim tunnel, <br />crushing structure, truck load out, ventilation fan, water tank, portal steel, water pump- <br />ing facility and substation. <br />City of Montrose, Montrose, Colorado <br />1 <br />1999-0 Phase I upgrade of the facility. The work included the installation of three new influent <br />screw pumps, a new ultra violet disinfection system, raw sewage piping modifications, <br />new stand-by Kohler generator, and a block with brick veneer building. The project <br />also included all civil, electrical, architectural, and mechanical work. <br />Western Fuels, Nucla, Colorado <br />1993 Erected wash bay and machine shop. <br />Cyprus Orchard Valley Mine, Paonia, Colorado <br />1992 Designed, fabricated, and installed portal air locks. <br />1993 Designed, manufactured, and erected complete tank farm including tanks, buildings, <br />and piping. <br />Installed new conveyor drive units to upgrade the underground belting for this coal- <br />mine, including transfer point structures. <br />Rebuilt storage silo and feed conveyors. <br />