My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99508
DRMS
>
Back File Migration
>
Revision
>
REV99508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:23 AM
Creation date
11/22/2007 12:27:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/2/2004
Doc Name
Comments to a New Proposed Reclamaton Liability
From
J.E. Stover & Associates
To
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~ Projects Completed During 1991-2002 <br />Mountain Coal Company -West Elk Mine, Somerset, Colorado <br />1992 Complete turnkey coal surface facility with three stacking tubes, live recovery, crush- <br />ing, electrical, and complete upgrading of all surface conveyors (changing all drives, <br />idlers, pulleys, wider belts, gravity take-ups) and reinforcing all structures. <br />1993 Complete design, fabrication, and installation of the upgraded underground coal trans- <br />fer points and chutes for increased belt speeds and tonnages with additional surge capa- <br />bility. <br />Twelve-month service contract for underground coal mining services. Contract called <br />for famishing twenty-four miners to support MCC miners. <br />1994 Design built a coal storage expansion facility which included a 114' stacking tube, live <br />recovery, conveyors, detention ponds, mechanical and electrical installation. <br />Six-inch welded mine water pipeline and a 6" I-IDPE fresh water pipeline. <br />1998 Refurbished 32 of the mine's longwall shields. ISI hauled the shields off site and <br />1 ~ worked 24 hours a day, 7 days a week replaring all the side and top plates and repairing <br />, numerous cracks. <br />2002 Construction of compressed air facility including two compressors, two air dryers, two <br />oiUwater sepazators, victaulic stainless and cazbon piping, all mechanical, electrical, <br />and erection of steel building. <br />Somerset Mining Company, Somerset, Colorado <br />1991 Fabricated and installed aone-mile overland conveyor, including four transfer build- <br />ings. <br />1992 Installed a live storage stacker belt structure, including athree-way transfer and stacker <br />belt structure. <br />1993 Installed a 1500 horsepower mine ventilating fan unit, including the electrical hookups. <br />American Soda, LLC, Parachute, Colorado <br />2001-2 General contractor for the expansion of the process plant facility. The work included <br />O fabrication and erection of the building, vessels, and associated structures, electrical <br />and instrumentation, piping and design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.