Laserfiche WebLink
SUMMARY <br />STRUCTURAL DEMOLITION <br />UNIT TRAIN LOADOUT <br />STRUCTURES AND SILOS <br />DMG ESTIMATE -STRUCTURES $ 667,003 <br />DMG ESTIMATE -SILOS $ 1,298,565 <br />SUBTOTAL DMG ESTIMATE $ 1,965,568 <br />CONTRACTOR BID (ISI) $ 770,400 <br />AMOUNT OF EXCESS BOND $ 1,195,168 <br />• <br />• <br />