Laserfiche WebLink
Bowie Resources limited -East Mine Reclamation <br />Bid Sheet <br />Item Unit Quantity Unit Price Bid Amount <br />Mobilization L S 1 57,044.00 57,044.00 <br />East Mine L S 1 810,000.00 810,000.00 <br />Timber Storage Area BCY 150,000 2 , 70 405 , 000.00 <br />Timber Storage Area LS 1 29 560.00 29 560.00 <br />Gob Pile LS 1 9,500.00 9,500.00 <br />Topsoil CY 1,500 7.64 11,460.00 <br />Structure Removal LS 1 NO BID NO BID <br />Paved Road LS 1 98,000.00 9s,ooo.oo <br /> <br /> <br /> <br />Total Bid Amount 1 , 420, 564.00 <br />Contractor: ~~ ~~S~t ~iAS~//ly~ CGS ~~Y9G <br />Signature: ~~ ~~ <br />Date: /~a~Ld~~ <br />I• <br />