Laserfiche WebLink
i~ <br />CON-SY Inc. <br />Bowie Resources Limited <br />East Mine Reclamation <br />Bid Clarifications <br />1) East Mine <br />A) all testing and survey by owner <br />B) Finish grade areas to be gouged (poched) by a track hoe as stated in the scope of work. <br />C) Rock sizing is excluded, lazger rock excavated to be placed in the deeper fills. <br />D) Seeding by others. <br />E) The quantity of excavation from the original scope of work has increased reflecting the higher <br />price on the bid tab <br />• 2) Structure Removal <br />A) Oyu bid includes removal of all the structures noted in the scope of work, however due to the <br />lack of historical date we do not know what substantial structures may be buried on the site, <br />removal of any thing larger than what is generally seen above grade will be negotiated at that time. <br />r ~ <br />~~ <br />