Bow-1 Scope of Work January 21, 2004 <br />The ditches, rip-rap ditches and light use roads, shown on Map 6A-5D Reclaimed <br />Surface Drainage, shall be constructed by the contractor. <br />The Contractor shall be paid the lump sum price stated in the bid sheet under East Mine <br />for the work required under this section. <br />Timber Storage Area <br />The timber storage area consists of a stockpile of dirt that was excavated from the fan <br />level. This stockpile shall be excavated to establish approximate original contours. The <br />existing and final contours for the Timber Storage Area are shown on Map Map 6A-5P <br />Timber Storage Area Reclamation Plan. Approximately 150,000 cubic yards shall <br />excavated from this area. This 150,000 cubic yard figure is included in the 420,000 <br />cubic yard figure stated above in the East Mine reclamation section. <br />The majority of the coal remaining on the timber storage area shall be removed by <br />others. The remaining coal shall be placed in the deep portions of the fill. The coal <br />shall be mixed with other dirt as it is placed in the fill. <br />Approximately 150 lineal feet of rip-rap channel will be required at the location where a <br />culvert will be removed from the access road to the timber storage area. <br />• The sediment pond shall not be removed during this phase of the project. Ditches shall <br />be constructed to route reclaimed area drainage to the sediment pond. <br />The Contractor shall be paid the unit prices stated in the bid sheet under Timber <br />Storage Area for the work required under this section. The cost to excavate, load, haul <br />and place the 150,000 cubic yards of material shall be included in the unit price bid <br />item. Measurement for payment shall be on the basis of the number of bank cubic <br />yards excavated and hauled to the East Mine reclamation project. The Contractor shall <br />be paid the lump sum price stated in the bid sheet under Timber Storage Area for the <br />remaining work required under this section. <br />Gob Pile <br />A minor amount work is required to complete the reclamation of the Gob Pile. The <br />exposed gob shall be covered with 3.5-feet of dirt and 9-inches of topsoil. The road to <br />the gob pile shall be regraded. <br />The gob pile sediment pond shall not be removed during this phase of the project. <br />Ditches shall be constructed to route reclaimed area drainage to the sediment pond. <br />i. , <br />