My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99508
DRMS
>
Back File Migration
>
Revision
>
REV99508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:23 AM
Creation date
11/22/2007 12:27:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/2/2004
Doc Name
Comments to a New Proposed Reclamaton Liability
From
J.E. Stover & Associates
To
DMG
Type & Sequence
RN4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• All Work shall comply with all federal, state and local codes for site area and the latest <br />approved publications and standards of the following: <br />Occupational Safety and Health Administration <br />Mine Safety and Health Administration <br />American Association of State Highway and Transportation Officials <br />American Society of Mechanical Engineers <br />American Concrete Institute <br />National Electrical Code <br />American Iron and Steel Institute <br />American National Standards Institute <br />American Railway Engineering Association <br />American Welding Society <br />American Water Works Association <br />American Society of Testing Materials <br />American Institute of Steel Construction <br />American Gear Manufacturers Institute <br />American Society of Civil Engineers <br />Institute of Electrical and Electronics Engineers <br />National Fire Protection Association <br />National Ready Mixed Concrete Association <br />• Steel Structures Painting Council <br />Concrete Reinforcing Steel Institute <br />The Contractor will be required to commence Work under this Contract within ten (10) <br />days after the receipt by him of notice to proceed, and shall prosecute said Work with <br />faithfulness and energy. <br />Not withstanding any other provisions of this Contract, the Owner has the right to <br />determine the extent by which a change in Drawings, Specifications, or excusable <br />delays will defer the completion of various elements of the Contract. The Owner may <br />extend the completion date for those specific elements so delayed and that the <br />remaining completion dates for all other portions of the Work will not be altered. <br />The Contractor shall inspect and determine access to the site for movement of his <br />equipment and materials. <br />The Contractor shall take notice of other construction and/or reclamation activities in <br />the work area and shall closely coordinate his Work with the Owner and other <br />Contractors working in the same area. <br />The Contractor shall take notice of all utility lines (sewer, drainage, water, electrical, <br />etc.) and structures that are in the construction area and properly protect same from <br />• damage. In the event the Contractor's activities damage same, any cost incurred by <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.