Laserfiche WebLink
Reclmation Bond Recalculalin Worksheet - DemolNlon <br />Loadout Faclliry <br />Silo Demolition <br />Means Factor 99.9% <br /> Means Base Adjusted <br />SlructureiFadlityiEquipment Description Dimensions Composition Guantitiy Unit Unit Cost Total Cost <br />fence 120LF chain link 120 lin.fl $ 1.78 <br />MCC at Loadout Superstructure 28'x24'xt2' 8,064 cu. Fl. $ 0.73 <br />slab 28'x24'x8' concrete 672 sq.ft. $ 4.71 <br />Pump HCUSe at Loadout SupersVUlure 36'x78'x10' 8,480 cuff. $ 073 <br />slab 36'x18'x8' concrete 648 sgft. $ 4.71 <br />walls (3) (3)12'x6'x108LF concrete 1,944 sq.ft. $ 13.60 <br />Miscellaneous Fencing 2800LF chain link 2,800 Iin.N. $ 1.78 <br />Railroad Track BSBBLF ties&irack 8,508 Iin.N. $ 6.52 ' <br />ballast 1590CV ballast 1,590 cu.yd. $ 2.74 <br />bridge reclamation (Adj Cypress Est) NA bridge 1 ea $ 132,264.00 <br />WO Gallon Fuel Tanks (2) 500 gal (2) 2 ea $ 342.50 <br />remove sludge from tank bottom 500 gal 2 ea $ 145.50 <br />dispose of sludge Pssume 100 gal 100 gal $ 3.45 <br />add C02 for cleaning 500 gal 15 Ib $ 1.78 <br />haul tanks to cenified dump 500 gal 2 ea $ 550.00 <br />3500 Gallon Tank 3500 gal 1 ea $ 342.50 <br />remove sludge from tank bottom 3500 gal 1 ea $ 145.50 <br />dispose of sludge Assume 350 gal 350 gal $ 3.45 <br />add C02 for tank Leaning 3500 gal 53 Ib $ 1.78 <br />haul tank to cenified dump 3500 gal t ea $ 550.00 <br />12,000 and 15,000 Gallon Tanks 12,000 & 15,000 gal 2 ea $ 855.00 <br />remove slutlge from tank bottom 12,000 & 15,000 gal 2 ea $ 242.50 <br />dispose of sludge Assume 2700 gal 2.700 gal $ 3.45 <br />add CQ2 for tank leaning 12,000 & 15,000 gal 405 Ib $ 1.78 <br />haul tanks to cenified dump 12,000&15,000 gal 2 ea $ 87500 <br />Concrete Disposal Charges 5621 cu.yd. concrete 5,621 cu.yd. $ 10.45 $ 58.662 <br />Total $ 1,072,795 <br />I/ <br />u <br />Bond Release <br />Loadout-SiloDemo J. E. Stover Associates <br />