Laserfiche WebLink
RECLAMATION COST SUBIARY cont~d <br />J. EARTNYORK - TOPSOIL/SUBSOIL REPLACEMENT i SPECIAL HANDLING <br />Task R~ Task Description ~ Cost (f) <br />39 ~ Topsoil ell disturbed areas ~ 1148,078 <br />40 ~ Cover Refuse Pile with Subsoil ~ 131,304 <br />62 ~ Distribute topsoil over pad, pits, and roads ~ 1911 <br />66 ~ Replace topsoil over drill pad ~ 5184 <br />69 ~ Salvage topsoil from 1.2 mill.ga 1. rater tank pad ~ f252 <br />71 ~ Replace topsoil on 1.2 mi Ll.ga L. rater tank pad ~ f168 <br />48A ~ Respreed topsoil on material storage bench (TRlJ67) ~ 120,651 <br />73 ~ Replace topsoil on Lane Pine Gulch Fen bench ~ 13,587 <br />Subtotal (J): 1205,135 <br />sheet 6 of 10 <br />