Laserfiche WebLink
RECLAMATION COST SUMMART cont'd <br />1. EARTHHORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk N~ Tesk Description <br />28A ~ Sediment Pond MB-7 <br />29 ~ Sediment Pond MB-2R <br />30 ~ Sediment Pond MB-3 <br />31 ~ Sediment Pond MB-4 <br />32 ~ Sediment Pord MB-5 <br />33 ~ Sewage Treatment Pord <br />34 ~ Freshwater Pond Fw-1 <br />53 ~ Beckfill MB-7 erd Fw-t Emergency Spillways <br />35 ~ Diversion Ditches DCY-iA erd [B and D7-6 <br />36 I All Sediment Ditches <br />38A <br />38D <br />38E <br />38F <br />I retail ri prep in permanent diversion ditches: <br />DCY-2 <br />Remove riprap at Bear Mine M1 <br />Remove brush pile et Bear Mine 31 <br />Ri LI 8 Gully repair during liability period <br />(f39.69)(D38))(200 hours) <br />Cost (f> <br />f13,089 <br />f11,5B9 <br />f7, 776 <br />f707 <br />f574 <br />f[0 <br />f7,330 <br />f496 <br />52,278 <br />f224 <br />f77,400 <br />f1, 816 <br />f1, 682 <br />f7,938 <br />Subtotal (1): f65, 649 <br />sheet 5 of 70 <br />