Laserfiche WebLink
:. I <br />• <br />useful material standing alone, while parcel "C" is comprised of <br />material best used for blending at other facilities. If, after <br />parcel "B" is mined, the operator has sufficient facilities to <br />blend material from parcel "A" and there is adequate demand for <br />such material, then mining shall continue to the south. <br />Otherwise, parcel "C" shall be mined first. In either event, the <br />plant site will most likely be moved to parcel "B" to efficiently <br />mine the other parcels. <br />All other aspects of the existing mining plan shall remain <br />unchanged and are incorporated by reference herein. <br />III. RECLAMATION PLAN REVIBION <br />Under this technical revision there shall be no area in excess of <br />20 acres mined and left open without topsoil and reseeding. In <br />addition, an alfalfa-grass mix shall be used to reseed reclaimed <br />areas rather than native grasses and shrubs. <br />All other conditions of the existing reclamation plan shall <br />remain unchanged and are incorporated by reference herein. <br />IV. RECLAMATION BOND REVISION <br />Permit Holder does not object to a reasonable adjustment in the <br />reclamation bond. A financial warranty endorsement to the <br />current surety bond shall be provided once the amount of the bond <br />is ascertained. <br />