My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99386
DRMS
>
Back File Migration
>
Revision
>
REV99386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:17 AM
Creation date
11/22/2007 12:26:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Revision
Doc Date
10/9/1998
Doc Name
FAX COVER
From
MCCULLEY FRICK & GILMAN INC
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OOT-OB-B6 02:16PL1 FROIkLIcCULLEYFRIC &GILLUN 3034471636 ~ T-OIB P.07/15 F-154 <br />• Tnm the upstream edge of the existing HDPE FML such that it terminates along the crest of the <br />interim bean. <br />• Deploy the GCL component of the first phase of the new liner sysum such that tt significantly <br />overlaps the trimmed free edge of the existing FML. <br />• Deploy the FML component of the first phase of the new liner system such that a extends beyond <br />the end of the deployed GCL and weld the new FML to the underlying eusting FML. <br />• Deploy the GCL component of the second phase of the new liner system such that it stgntficanily <br />overlaps the weld securing the firs[ phase FML to the previously existing FML and the first phase <br />GCL. <br />• Place a bead of granular ben[onite along the free ends of the second phase GCL panels to provide <br />an enhanced seal against moisture mtgratmg under the GCL. <br />• Deploy the FML component of the second phase of the new liner system such that it overlaps the <br />free end of the second phase GCL component and weld the second phase FML to the first phase <br />FML. <br />All FML seams are to be tested both non-destrucnvely and destructively, in accordance with approved <br />protocols, [o ensure the integtiry and strength of the welds. Atypical cross-secoon of the proposed liner <br />system design modificanon at the mtenm berm is shown on Detail 4, Drawing 5461-C5. <br />J ~Si6i~tECH-REVI.WpI) $ October 9, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.