My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99386
DRMS
>
Back File Migration
>
Revision
>
REV99386
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:17 AM
Creation date
11/22/2007 12:26:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Revision
Doc Date
10/9/1998
Doc Name
FAX COVER
From
MCCULLEY FRICK & GILMAN INC
To
DMG
Type & Sequence
TR5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OCT-OB-86 02:16PM FROIMMcCULLEYFRI~ ILLIAN 3034471636 ~ T-01B P 06/15 F-154 <br />Table 2 <br />Summary of Slope Stability Analyses ResWts <br /> Safety Factor <br /> XSTANL 8seudoatatic <br />Fi re file Parameters Starie X0.02 <br /> Up stream analysis, Rattkine block (tathngs - <br /> geornetnbranc interface), post constnrcnon of <br />1 PCRl320 embatilrnent raise, sanuated [azlings (phrcatic surface 1.02 0.98 <br /> 1 ti below exposed surface), sranc and pseudo-sratic <br /> ground monon. <br /> Up stream analysis, Ranlcmc block (tailings - <br /> geomemhrane inteIfaee), post construction of <br />2 UPXR81 em6ankmcnt ralsc, wedge of the tailings removed, 0.81 0.77 <br /> saturated tathngs (phreatic surface 1 h below exposed <br /> surface), sranc and pseudo-stant ground monon <br /> Up stream analysis, Rmkina block (raihngs - <br /> geomcmbrane interface), post construction of <br />3 pC1tB21 L ctnbat>>®ent raise, 1.5 h of sort buttress on top of 1.20 1.15 <br /> railings, saturated tads (phreatic surface 1 fr below <br /> exposed surface), Static and pseudo-sratiC g[OUnd <br /> monon. <br />B. LINER EXTENSION AND CONTINUITY <br />The ongmal design of the liner system for the tailings rmpoundmrnt expansion contemplared that <br />the trammed upstream edge of the existing HAPE FML would be secured is an anchor wench excavated in <br />an mtenm berm left between [hc original pond and the excavation area of the expanded pond The first phase <br />of the aew liner system (GCL and FML) would rhrn be secured in the same anchor trench, followed by the <br />second phase GCL component of she new liner system- Frnally, the upstream edge of the second phase of <br />the new FML would be deployed such that it would overlap the anchor trernch and thrs edge of the FML <br />would be welded to the previously installed firs[ phase FML to produce a continuous new liner system <br />throughout the impoundment. Ihtrittg excavation of the expended unpoundmrnt, bedrock was cncountacd <br />in the vicuury of the mtenm berm that precluded the effective construction of an appropriate anchor trrnch. <br />The following eltemare eppronch is proposed to secure and maintain the effective connnwty of the <br />various components of the liner systems: <br />7 W6t~7ECH-1tEV1.wPD 4 October 9, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.