<br />EXHIBIT E <br />RECLAMATION PLAN AMENDMENT <br />This area has a mining history that predates the 1976 Reclamation Act and much of the <br />disturbance of this azea occurred prior to the Act. The applicant plans on reclaiming the <br />disturbance created by this operation as well as the disturbance pre-dating the Reclamation Act. <br />The post-mining use of the site will be for residential development. <br />Reclamation of the site will be concurrent with mining activity. The distwbance azea currently <br />exceeds the maximum total of 29 acres. The applicant is in the process of reclaiming areas to <br />reduce the disturbance at or below 29 acres. The reclamation plans for each of the disturbed <br />areas are discussed below, <br />Open Pit (Area 1) <br />After the sand and gravel is processed it will be used to backfilled to within ten to fifreen feet of <br />the existing ground surface. Once the site is completely backfilled the pit area will be graded to <br />closely match the current topography, covered with a minimum of four inches of topsoil, then <br />revegetated and fertilized. <br />Eauinment Storage and Parking Areas (Area 2) <br />The equipment storage and parking areas will be ripped, graded, seeded, and fertilized. <br />Processing and Stockpile Areas and Access Roads Area 3) <br />Most of the buildings and equipment at the processing site will be removed once mining has <br />been completed. However, the owner of the land would like to have the option of preserving the <br />processing building following mining. Then processing azea will require some ripping and <br />grading prior to revegetating and fertilizing. <br />The access roads will be ripped, graded, seeded, and fertilized. <br />Tailings Impoundment and Catch Basins (Area 41 <br />The tailings impoundment and emergency catch basin areas are relatively flat. The reclamation <br />plan for these areas will be creation of a grassy meadow. This will require some grading prior to <br />the placement of a seeding mixture and fertilizer. The slope of the impoundment will be graded <br />3H:1 V (Horizontal: Vertical}. The reclamation of the tailings facility area will begin before <br />1999. <br />E-1 <br />,. <br />