Laserfiche WebLink
INSERTION INSTRUCTIONS <br />SENECA II-W PERMIT NO. C-82-057 <br />PERMIT REVISION (PR-04) <br />September 1, 2004 <br />TAB 3. Adjudication File. Volume 1 <br />• Attachment 3-5, Owner, Officer, and Director Information -replace Organizational <br />Structure Chart and insert the Offices information for BTU Worldwide, Inc. <br />TAB 9. Soil Baseline Information. Volume 5 <br />• Exhibit 9-3, Soil Survey Map -replace existing exhibit <br />TAB 13 Facilities Volume 7A <br />• Attachment 13-SH, As-Built Report Sedimentation Structure 017 -insert attached page at <br />beginning of Addendum 13-SH-D, Pond 017 Compaction Testing Results. <br />TAB 19. Reclamation Schedule. Volume 12 <br />• Text -replace pages 4 through 6 <br />• Exhibit 19-IA, Backfill and Grading Schedule -replace existing exhibit <br />TAB 21. Minesoil Reconstruction. Volume ]3 <br />• Text -replace TOC and pages 23 through 28 <br />TAB 25, Bonding, Volume 14 <br />• Text -replace entire section <br />