Laserfiche WebLink
<br />THE SPECIFIC COMPLL4NCE DATES AND MEASURES WILL BE THE FOLLOWING: <br />1. JULY 1, 2001 -COMPLETE THF. DRILLING PROGRAM, AS REFERENCED IN THE <br />COLORADO DNISION OF WATER RESOURCES LETJ'ER TO THE DMSION, DATED <br />FEBRUARY 9, 2001, INCLUDING INSTALLATION OF PIEZOMETERS OR OTHER <br />DOWN-HOLE INSTRUMENTATION. <br />2. SEPTEMBER 1, 2001 -SUBMIT THE RESULTS OF THE INVESTIGATION AND <br />SEISMIC EVALUATION OF THE STRUCTURE, INCLUDING RECOMMENDATIONS FOR <br />ANY ADDTT7ONAL INSTRUMENTATION, WCI7-I THE ABOVE-REFERENCED <br />TECHNICAL REVISION FOR DIVISION REV~W AND APPROVAL. <br />3. NOVEMBER 1, 2001 - INSTALL ANY ADDITIONAL INSTRUMENTATION IN <br />ACCORDANCE WITH THE FINAL INSTRUMENTATION PLAN APPROVED IN THE <br />ABOVE-REFERENCED TECHMCAL REVISION. <br />4. GATHER ALL BASELINE DATA AS REQUIRED IN THE ABOVE-REFERENCED <br />TECHNICAL REVISION, BEFORE MINING PROCEEDS Wn11iN A l MB_.E RADIUS OF <br />THE DAM. <br />S. PROVIDE A FINAL REPORT' AND IMPACT ANALYSIS, BY A SECOND <br />TECHMCAL REVISION, AT LEAST 90 DAYS PRIOR TO ANTICIPATED MINING <br />WITHIN ONE MILE OF THE DAM. <br />MINING WITHIN ONE MILE OF THE TERROR CREEK RESERVOBt (BRUCE PARK <br />DAM) WILL NOT BE APPROVED UNTIL ALL NECESSARY MONITORING DATA, <br />ANALYSES, REPORTS AND SUBSmENCF. CONTROL PLAN DETAIlS ARE <br />APPROVED, BY THE SECOND TECHNICAL REVISION, AND IT IS SHOWN THAT <br />SUCH MINING WB.[. NOT ADVERSELY IMPACT THE DAM. <br />lO. PRIOR TO AFFECTING USDA-FOREST SERVICE (FS) WATER RIGHTS BY MINING, <br />THE OPERATOR WILL SUBMIT TO THE DIVISION FOR APPROVAL, A TECHNICAL <br />REVISION THAT WCLUDES 1) A REVISED MAP 23, "WATER RIGHTS LOCATION" <br />AND REVISED TEXT THAT DESCRIBE THE FS WATER RIGHTS WCCHIN THE <br />PERMIT AND ADJACENC AREA, AND 2) VERII-(CATION THAT A COURT- <br />APPROVED WATER AUGMENTATION PLAN IS IN EFFECT FOR THOSE FS WATER <br />RIGHTS WnxIN THE PERMIT AND ADJACENT AREA THAT MAY BE <br />CONTAMINATED, DBviINISHED OR INTERRUPTED BY MINING. <br />