My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99261
DRMS
>
Back File Migration
>
Revision
>
REV99261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:11 AM
Creation date
11/22/2007 12:24:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
2/27/2001
Doc Name
COAL MINING PERMIT PERMIT REVISION DECISION BOWIE 2 MINE BOWIE RESOURCES LIMITED PN C-96-083
Type & Sequence
PR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE SPECIFIC COMPLL4NCE DATES AND MEASURES WILL BE THE FOLLOWING: <br />1. JULY 1, 2001 -COMPLETE THF. DRILLING PROGRAM, AS REFERENCED IN THE <br />COLORADO DNISION OF WATER RESOURCES LETJ'ER TO THE DMSION, DATED <br />FEBRUARY 9, 2001, INCLUDING INSTALLATION OF PIEZOMETERS OR OTHER <br />DOWN-HOLE INSTRUMENTATION. <br />2. SEPTEMBER 1, 2001 -SUBMIT THE RESULTS OF THE INVESTIGATION AND <br />SEISMIC EVALUATION OF THE STRUCTURE, INCLUDING RECOMMENDATIONS FOR <br />ANY ADDTT7ONAL INSTRUMENTATION, WCI7-I THE ABOVE-REFERENCED <br />TECHNICAL REVISION FOR DIVISION REV~W AND APPROVAL. <br />3. NOVEMBER 1, 2001 - INSTALL ANY ADDITIONAL INSTRUMENTATION IN <br />ACCORDANCE WITH THE FINAL INSTRUMENTATION PLAN APPROVED IN THE <br />ABOVE-REFERENCED TECHMCAL REVISION. <br />4. GATHER ALL BASELINE DATA AS REQUIRED IN THE ABOVE-REFERENCED <br />TECHNICAL REVISION, BEFORE MINING PROCEEDS Wn11iN A l MB_.E RADIUS OF <br />THE DAM. <br />S. PROVIDE A FINAL REPORT' AND IMPACT ANALYSIS, BY A SECOND <br />TECHMCAL REVISION, AT LEAST 90 DAYS PRIOR TO ANTICIPATED MINING <br />WITHIN ONE MILE OF THE DAM. <br />MINING WITHIN ONE MILE OF THE TERROR CREEK RESERVOBt (BRUCE PARK <br />DAM) WILL NOT BE APPROVED UNTIL ALL NECESSARY MONITORING DATA, <br />ANALYSES, REPORTS AND SUBSmENCF. CONTROL PLAN DETAIlS ARE <br />APPROVED, BY THE SECOND TECHNICAL REVISION, AND IT IS SHOWN THAT <br />SUCH MINING WB.[. NOT ADVERSELY IMPACT THE DAM. <br />lO. PRIOR TO AFFECTING USDA-FOREST SERVICE (FS) WATER RIGHTS BY MINING, <br />THE OPERATOR WILL SUBMIT TO THE DIVISION FOR APPROVAL, A TECHNICAL <br />REVISION THAT WCLUDES 1) A REVISED MAP 23, "WATER RIGHTS LOCATION" <br />AND REVISED TEXT THAT DESCRIBE THE FS WATER RIGHTS WCCHIN THE <br />PERMIT AND ADJACENC AREA, AND 2) VERII-(CATION THAT A COURT- <br />APPROVED WATER AUGMENTATION PLAN IS IN EFFECT FOR THOSE FS WATER <br />RIGHTS WnxIN THE PERMIT AND ADJACENT AREA THAT MAY BE <br />CONTAMINATED, DBviINISHED OR INTERRUPTED BY MINING. <br />
The URL can be used to link to this page
Your browser does not support the video tag.