Laserfiche WebLink
<br />Bowie No. 2 Mine (Permit No. C-1996-083) <br />Permit Revision No. 4 <br />Stipulation No. Description <br />7. APPROVAL OF PERMIT REVISION NO. 4 FOR THE BOWIE NO. 2 MwE Is <br />COND['['[ONED UPON THE RESOLUTION OF THE FOLLOWBNG: <br />1) KENTUCKY CITATION NO. C98-081-414-001, ASSOCIATED WrI11 STAR FIRE <br />MINING COMPANY; <br />2) KENTUCKY FORFEITURE, CESSATION ORDERS NOS. 050265 AND 050320 AND <br />Crvn. PENALTIES Nos. 052522, 052908 AND 053099 FOR PERMIT No. 8980140, <br />ASSOCIATED WITH CATAWABA INDUSTRIES; <br />3) WEST VII2GINIA CESSATION ORDER NO. 031-C FOR PERMIT NO, SOI2782, <br />ASSOCIATED WITII CANNELTON INDUSTRIES INC. <br />PROOF OF RESOLUTION SHOULD BE SUBMITTED TO THE COLORADO DIVISION <br />OF MINERALS & GEOLOGY AS SOON AS IT BECOMES AVAILABLE <br />8. APPROVAL OF PERMIT REVISION NO. 4 FOR THE BOWIE NO. 2 MINE Is <br />CONDITIONED UPON THE RESOLUTION OF THE FOLLOWING: <br />I) VIOLATIONS AND FORFEI"IIJRES UNDER THE PITTSON SETTLEIvIENT: <br />A) VlRCUiIA FORFEITURES FOR PERMIT NUMBERS 1200724, 2339, 2503, <br />3053-U, 3394 AND 1200551, <br />B) VIRGINIA VIOLATIONS NUMBERS 080-OO1-018-004 AND 080-001- <br />018-005, <br />C) WEST VIRGINIA FORFEITURES FOR PERMIT NUMBERS UO357O0 AND <br />U074400. <br />PROOF OF RESOLUTION MUST BE SUBMITTED TO THE COLORADO DIVISION OF <br />MINERALS 8c GEOLOGY AS SOON AS IT BECOMES AVAILABLE, <br />9. A DETAIIED SUBSIDENCE STUDY FOR TERROR CREEK RESERVGIR DAM (BRUCE <br />PARK DAM) WILL BE COMPLETED AND APPROVED PRIOR TO MINING WITHIN <br />ONE MIl.E OF THE DAM. THE STUDY WILL ESTABLISH BASELINE CONDII7ONS, <br />POTENTIAL MINING-INDUCED SEISMICITY AND POTENTIAL TRANSLATED <br />EFFECTS TO THE DAM. <br />BY SEPTEMBER 1, 2001, BOWtF. RESOURCES WB.L SUBMTT A TECI-CVICAL <br />REVISION TO THE PERMIT ADDRESSING THE INVESTIGATION, DATA <br />COLLECTION, ANALYSIS, AND MONITORING PLAN TO ENSURE THE SAFETY AND <br />IN"IEGRITY OF THE TERROR CREEK RESERVOIR DAM (BRUCE PARK DAM). THE <br />REVISION MATERIALS WILL INCLUDE, BUT NOT $E LIMITED T0, DATA, A <br />TECHNICAL REPORT, COMPLIANCE SCHEDULES, A SUBSIDENCE CONTROL PLAN, <br />A DETAILED MDNITGRA'G PLAN SPECIFIC TO POTENTIAL SEISMICITY AND ANY <br />OTHER POTENTIAL IMPACTS INDUCED BY LONGWALL MB9BdQ LN ADDI"I'ION, <br />