Laserfiche WebLink
. ./~ <br /> <br />7. Before this application can be approved, a copy of the agreement betwee <br />Canal Water Users Assoc. will need to be submitted. That association will <br />an agreement to be responsible for installation and maintenance of the rechar <br />canal to the pit. <br />8. It is recommended that the replaced topsoil be tilled prior to seeding, espec <br />amount of time has passed since replacing the topsoil, or if excessive co <br />while laying the topsoil down. <br />the Rio Grande <br />so need to sign <br />pipes from the <br />if a significant <br />coon occurred <br />9. In a dry climate like the Del Norte area, and without irrigation, mulching the see ed areas of the <br />reclamation should greatly improve the chances for successful vegetation establishment. <br />Please include a mulching task in the reclamation plan that specifies certified eed free mulch <br />applied at a recommended rate of 2 tons per acre. <br />10. Please revise the seed mix Specification to indicate ounds of PLS/acre. <br />11 . For Exhibit M, please verify whether annual production is still projected to remai under 70,000 <br />tons per year. <br />1 2. Does Southway plan to temporarily store any hazardous or toxic materials, s ch as fuel, oil, <br />hydraulic fluid, antifreeze, etc. on site? If so, please submit plans for an adequate spill <br />containment structure for storage of these items. <br />13. Please specify what, if any, stormwater control structures will be necessar to prevent a <br />stormwater discharge from the affected areas of the site. <br />14. For currently identified structures within 200 feet of the proposed mine site, ad quate damage <br />compensation agreements, or engineering evaluations are still required for the ell owned by <br />John Von Bernuth and the Tri-State transmission line. If Rio Grande County wns the fence <br />along the highway right-of-way, this fence must be added to the damage compensation <br />agreement with the County. <br />Please ensure that all structures within 200 feet of the affected area have bee identified and <br />either a damage compensation agreement or an engineering demonstration tha the structure <br />will not be damaged has been secured for each structure. <br />The engineering evaluation by Mr. Ungefug will not be acceptable for this revi ed mine plan. <br />In addition, any new engineering evaluation must be a demonstration of by a specific <br />structure will not be damaged. A general statement that the structure will not a damaged is <br />not acceptable. <br />If you have questions or need additional information, please contact me at our Durang Field Office, <br />484 Turner Drive, Building F, Suite 101, Durango, Colorado 81301, phone no. (970) 47-5062. <br />Sincerely, <br />_~~~ <br />Steve S. Shuey <br />Environmental Protectio ecialist <br />Enclosure <br />