Laserfiche WebLink
<br />ROCKCASTLE/CMLRD DRAFT AGREEMENT <br />PMH6S DRAFT 6/6/90 <br />3. Any sediment control measures designated in NOV C-89- <br />034 which are not removed pursuant to $ III(2) above will be <br />subject to the following conditions: <br />a. Rockcastle will evaluate existing sediment controls <br />and design additional sediment control measures as necessary for <br />areas designated in NOV C-89-034 which are not removed pursuant to <br />$ III(2) above. The Division shall grant small area exemptions to <br />Rockcastle from sediment control requirements provided the <br />requirements of 2 CCR 407-2, Rule 4.05.2(3) are met. Rockcastle <br />may install sediment control facilities other than sediment ponds <br />pursuant to 2 CCR 407-2, Rule 4.05.2. For areas designated in NOV <br />C-89-034 which allegedly lack sediment controls, Rockcastle will <br />install additional sediment control facilities only for areas where <br />an exemption under 2 CCR 407-2, Rule 4.05.2(3) is unavailable. <br />Rockcastle will modify existing sediment control structures <br />designated in NOV C-89-034 only where these existing sediment <br />control facilities are inadequate and only where areas controlled <br />by these control structures do not qualify for exemptions under 2 <br />CCR 407-2, Rule 4.05.2(3). <br />4. Within 30 days of completion of backfilling and grading <br />activities specified in paragraph II(1) Rockcastle will prepare a <br />postmining topography map and approximate original contour study <br />6 <br />