Laserfiche WebLink
~. <br />ROCKCASTLE/CMLRD DRAFT AGREEMENT <br />PMH&S DRAFT 6/6/90 <br />reclamation activities conform to the standards of the Act. <br />Rockcastle will implement additional reclamation measures based <br />upon the results of each respective study as follows: <br />1. The Division and Rockcastle agree that backfillinq and <br />grading of Pits 5 and 6 occurred before approval of the Permit. <br />The parties agree that minor variations exist between the <br />postmining topography as proposed in the Permit and the existing <br />postmining topography in parts of Pits 5 and 6. Rockcastle will <br />complete an engineering study assessing the geotechnical and <br />geomorphic stability of those areas of Pits 5 and 6 which do not <br />conform to the approved postmining topography. Rockcastle will <br />implement appropriate additional reclamation measures to stabilize <br />nonconforming areas of Pits 5 and 6 pursuant to 2 CCR 407-2, <br />Rule 4.14.2(1). <br />2. Rockcastle will reassess the geotechnical stability of <br />the potential slope failure area adjacent to the haul road to Pit <br />4. Rockcastle will implement appropriate reclamation measures to <br />the extent necessary to stabilize mass movement features related <br />to the haul road to Pit 4 only in those areas that are not stable <br />pursuant to 2 CCR 407-2 Rule 4.14.2. Stabilization work may <br />involve importation of material from offsite sources. <br />5 <br />