My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99181
DRMS
>
Back File Migration
>
Revision
>
REV99181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:07 AM
Creation date
11/22/2007 12:24:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
6/8/1990
Doc Name
ROCKCASTLE CO GRASSY GAP MINE
From
PARCEL MAURO HULTIN SPAANSTRA PC
To
MLRD
Type & Sequence
SF1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br />ROCKCASTLE/CMLRD DRAFT AGREEMENT <br />PMH&S DRAFT 6/6/90 <br />reclamation activities conform to the standards of the Act. <br />Rockcastle will implement additional reclamation measures based <br />upon the results of each respective study as follows: <br />1. The Division and Rockcastle agree that backfillinq and <br />grading of Pits 5 and 6 occurred before approval of the Permit. <br />The parties agree that minor variations exist between the <br />postmining topography as proposed in the Permit and the existing <br />postmining topography in parts of Pits 5 and 6. Rockcastle will <br />complete an engineering study assessing the geotechnical and <br />geomorphic stability of those areas of Pits 5 and 6 which do not <br />conform to the approved postmining topography. Rockcastle will <br />implement appropriate additional reclamation measures to stabilize <br />nonconforming areas of Pits 5 and 6 pursuant to 2 CCR 407-2, <br />Rule 4.14.2(1). <br />2. Rockcastle will reassess the geotechnical stability of <br />the potential slope failure area adjacent to the haul road to Pit <br />4. Rockcastle will implement appropriate reclamation measures to <br />the extent necessary to stabilize mass movement features related <br />to the haul road to Pit 4 only in those areas that are not stable <br />pursuant to 2 CCR 407-2 Rule 4.14.2. Stabilization work may <br />involve importation of material from offsite sources. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.