Laserfiche WebLink
K. <br />ROCKCASTLE/CMLRD DRAFT AGREEMENT <br />PMH&S DRAFT 6/6/90 <br />II. GRASSY GAP MINE SITE RECLAMATION ACTIVITIES -- Rockcastle <br />agrees to undertake the following reclamation activities at the <br />Grassy Gap Mine: <br /> <br />1. Backfill and grade Pit 4 utilizing material in the <br />overburden stockpile in accordance with specifications set forth <br />in the approved Grassy Gap Reclamation Plan as embodied in the <br />Permit (the "Reclamation Plan"). <br />a. Rockcastle may leave additional overburden material <br />in the overburden stockpile upon submission of a technical report <br />demonstrating that the permanent stockpile will comply with 2 CCR <br />407-2, Rule 4.14.2 and 4.09, if overburden material remains in the <br />overburden stockpile after (1) completion of backfillinq and <br />grading activities described in S II(1) above, and (2) after use <br />of any overburden material which may be required by reclamation <br />activities described in $ IV(1) and S IV(2). <br />2. Replace a minimum of 12 inches of topsoil on disturbed <br />portions of Pit 4 in accordance with the specifications set forth <br />in the Reclamation Plan. <br />3. Reseed disturbed portions of Pit 4 in accordance with <br />2 <br />