Laserfiche WebLink
<br />J. J. Dudash - 3 - April 20, 2007 <br />boreholes, reclaim the light use roads and narrow the upgraded and refurbished light use <br />roads. The estimated reclamation expense is $136,462. <br />T&E Species Survey <br />Volume III, Tab 9 contains a wildlife inventory prepared by Wildlife Habitat & Natural <br />Resources Specialists dated May 24, 2000 which encompasses the proposed location of <br />the light use roads and drill sties. <br />The following revised permit pages and maps are enclosed. <br />Pages/Maps Discussion <br />Volume I <br />2.05-25 & 47 Clarified that new light use roads will be reclaimed and upgraded <br />and refurbished light use roads will be configured to support the <br />postmining land use of rangeland and wildlife habitat. <br />Reclamation Estimate <br />Volume II <br />Map 9 Shows location of new, upgraded and refurbished light use roads <br />and gob vent borehole drill sites. Presents a table which lists <br />disturbance associated with each road segment and gob vent <br />borehole drill site. <br />Please call if you have any questions. <br />Sincerely, <br />~~~~~~ <br />J. E. Stover, P.E. <br />Consulting Engineer <br />cc: Wm. A. Bear, Jr. <br />