Laserfiche WebLink
t <br />t <br />1 <br />1 <br />1 <br />1 <br />1 <br /> <br />EX1iIBIT E (Cont'd) <br />Reclamation Timetable <br />The reclamation phases listed on this page may be correlated <br />to map Exhibit D-1 and F. The phases correspond to the mining <br />stages and are numbered accordingly. Note that these are estimates <br />only and that variations may occur. <br /> Reclamation Timetable <br /> Bank <br /> Slope <br />Reclamation Below <br />Phase Years Total Water Water Road <br />I 4-6 11.30 9.42 3.12 0.27 <br />II 4-6 8.46 7.18 2.13 0.20 <br />Total Acres + 19.76 16.60 5.25 0.47 <br />14 <br />Revegetation <br />1.61 <br />1.07 <br />2.68 <br />