My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98900
DRMS
>
Back File Migration
>
Revision
>
REV98900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:54 AM
Creation date
11/22/2007 12:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Revision
Doc Date
10/11/1988
Doc Name
REGULAR 112 PERMIT APPLICATION SUMMIT AGGREGATE PIT EL PASO CNTY
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase II - 16.7tacres. About 12*_ acres to be disturbed. <br />Area to be mined over a period anticipated to be <br />about 10 to 12 years. Benches to be developed in <br />conjunction with the operation. Final reclamation <br />to begin upon completion of operations. <br />Soil Salvage <br />Exhibit I provides information pertaining soils in this area. <br />Because of the discontinuous occurrence of soil, steep terrain and <br />logistics and safety hazards of trying to salvage available soil, selective <br />soil salvage will be required during the course of operations. Therefore, <br />determinations of potential volumes will be available only following actual <br />stripping activities. Where possible, the upper 8 to 12 inches of+itbe.soil~ <br />profile will ba otl+o~ei and-stocicpt28d.~ As a stabilization measure, any <br />soil stockpiled for one growing season or longer will be planted xttiva <br />perennial sod-forming grass cover.. The company will provide an estimate in <br />its annual report of the volume of soil salvaged during the previous <br />operating season. A materials balance will be submitted to address <br />specific reclamation uses of the medium salvaged. Placement of soil and <br />revegetation can occur on the higher benches once the operations are <br />completed there. <br />Mining Operation <br />The upper portion of the area to be mined is composed of extensively <br />weathered granite (grus). This material can be mined by simple ripping of <br />the grus using a DSL or D9 dozer with a single shank or multi-shank ripper. <br />When more competent rock is encountered it will be mined by <br />traditional methods used for development of hard rock open pits. The rock <br />will be drilled, blasted and removed by using wheeled loaders and haul <br />trucks. Dozers and other equipment will also be used for maintenance and <br />development. The rock will be sized on site by crushing and screening and <br />
The URL can be used to link to this page
Your browser does not support the video tag.