My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98900
DRMS
>
Back File Migration
>
Revision
>
REV98900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:54 AM
Creation date
11/22/2007 12:22:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977210
IBM Index Class Name
Revision
Doc Date
10/11/1988
Doc Name
REGULAR 112 PERMIT APPLICATION SUMMIT AGGREGATE PIT EL PASO CNTY
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ibit E - Reclamation Plan <br />Tht~ial of reclamation will be to stabilize the site.- By virtue of <br />the mining operation and related topographic constraints, the site will <br />have some limited use as rangeland and limited wildlife habitat. The pit <br />floor and other open areas may also be used for construction of buildings, <br />recreation or other purposes. <br />Reclamation will consist of benching the pit walls, to be done largely <br />in conjunction with the mining operation, and limited replacement of soil <br />and revegetation. <br />The upperwost bench of each pit will be about 15 to ZO flit tad <br />have no core than a 15 foot vertical drop around the toy. 7R4~ :.-..:. <br />serva+,M a. type of safety/warning bench. The ~ ~e..~y <br />range from 10 to 15 feet in width/ vita 3Q to ~ !Nt :~'-°' <br />eloping from 65 to 75 de6reeaf The ovaull orpdepa..af-Ei~ptt, e!S <br />m~woi ~ao~ the create oP the benches, will range from~a~out 4~'tb 55 <br />de.~'eea. The actual spacing and configuration of the benches will be <br />controlled by the structure of the rock and MSHA and may be revised <br />accordingly during the course of the operation. Because both phases of the <br />pit will be mined into a slope the benches will outlet onto the adjacent <br />hillside affording easy exit from any bench. The Exhibit F map included <br />herein illustrates the expected final topography of the operation. <br />,a11pN1;• sieilar debris will be cleaned up at the end of ~ <br />operations. ~ /V D <br />Runoff Diversions <br />Any runoff diversions constructed upslope of the pit during the mining <br />
The URL can be used to link to this page
Your browser does not support the video tag.