Laserfiche WebLink
<br /> <br />C~ <br />Mr. Larry Reschke -2- September 17, 1985 <br />9. Blue Ribbon should define "upper soil horizon". A description of depth <br />of stripping, equipment to be used, total volume to be removed by horizon, <br />whether any storage of the material will occur, and whether all the material <br />is non-toxic, non-acid forming should be included. What material is to be <br />used as plant growth media during reclamation of the borrow area. <br />10. What utility corridors exist adjacent to the borrow area. <br />11. What is the source of shrub transplants and at what rate will they be <br />used? <br />12. Biue Ribbon Coal Company should submit a plan to divert runoff from above <br />around the site and contain or treat disturbed runoff from the site. <br />If you have any questions after reviewing these comments and questions, please <br />feel free to call me or Bob Liddle. <br />Since ely, <br />/~~ ,. <br />Susan Mowry / ` <br />Reclamation Specialist <br />SM/ph <br />cc: Mr. Randy Watts <br />3410E <br />