Laserfiche WebLink
Letter to Kent Gorham <br />Paee 3 of 3 <br />In addition to the above modifications and responses to the Division's adequacy issues, LCC has <br />revised the bond calculations based on using a smaller equipment fleet. The following <br />replacement pages aze attached: <br />Pages 2.05-33 and 2.05-33a <br />Figures 2.05,4-1 through 2.05.4-16 Cross Sections <br />MAP 2.05.3-3a Haul Road Plan <br />MAP 2.05.4-1 Post Mining Topography <br />Pages 3-l, 3-la, 3-lb, 3-2, 3-3, 3-4, 3-5, 3-6, 3-7 <br />Reclamation Bond Calculation Sheets 1, 7, 8, 9, and 10 of 10 <br />Jeff Canyon Surface Mine -Fill Areas -Ditch Summary <br />Figure EX 15-15 Surface Water Management Plan <br />SEDCAD D57 and D58 <br />SEDCAD D87 and D88 <br />SEDCAD <br />SEDCAD <br />Pond 006a, 25-Year, 24-Hour <br />D98, D99 <br />MAP 2.05.4-1 and Figure EX 15-15 show the north permit boundary without the adjustment for <br />Pond 008a previously submitted. The north permit boundary will not need to be changed in that <br />azea. <br />The deadline for a decision on TR-08-will occur during the next two weeks; therefore, to allow <br />adequate time for review, LCC hereby requests an extension to May 3 for the TR-08 decision <br />date. <br />Should you have more comments or wish further discussion, please call. <br />Sincerely, ~ <br />~~7~ <br />K. M. Kolin <br />