Laserfiche WebLink
October 2004 -iv- <br />• <br />LIST OF APPENDICES <br />043-2170 <br />built) Drawings <br />Phase Nc General Composite Overview <br />Phase Nc Secondary Underdrain As-built <br />Phase Nc Top of Soil Liner Fill As-built <br />Phase Nc Leak Detection Trench As-built <br />Geomembrane Record Drawing: Phase Nc Ore Storage Area <br />Phase Nc High Volume Solution Collection System As-built <br />Appendix B Photographic Documentation <br />Appendix B-1 Photograph Log <br />Appendix B-2 Documentary Photographs <br />Appendix C Staff Schedule for Golder Personnel <br />Appendix D Weekly Reports <br />Appendix E Technical Specifications <br />Appendix F Surveyor's Certificate <br />Appendix A Record (As <br />Record Drawing No. 1 <br />Record Drawing No. 2 <br />Record Drawing No. 3 <br />Record Drawing No. 4 <br />Record Drawing No. 5 <br />Record Drawing No. 6 <br />Appendix G Subgrade Acceptance Forms <br />Appendix H Concrete Observation and Testing Results <br />Appendix I CQA Laboratory Test Results <br />Appendix I-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix I-2 Compaction Tests <br />Appendix I-3 Soil Liner Fill Permeability Tests <br />APPENDIX JGEOMEMBRANE QUALITY CONTROL DOCUMENTS AND INVENTORY <br />Appendix J-1 Geomembrane Inventory Control <br />• <br />Appendix J-2 Resumes of Installation Personnel <br />Appendix J-3 Geomembrane Resin QualiTy Control Certificates <br />Appendix J-4 Geomembrane Roll Quality Control Certificates <br />Appendix J-5 Welding Rod Quality Control Certificates <br />Appendix J-6 Geotextile Roll Quality Control Certificates <br />Appendix J-7 HDPE Pipe Certifications <br />Appendix K OSA G eomembrane Installation Observations <br />Appendix K-1 Conformance Test Results <br />Appendix K-2 OSA Deployment Observations <br />Appendix K-3 OSA Trial Seam Summaries <br />Appendix K-4 Tensiometer Certification <br />Appendix K-5 OSA Fusion Welding Summary <br />Appendix K-6 OSA Extrusion Welding Summary <br />Appendix K-7 OSA Defect/Repair Summary <br />Appendix K-8 OSA Destructive Testing Summaries <br />Appendix K-9 OSANnn-Destructive Testing Summaries <br />Appendix L Underground Workings Geosynthetics Observation <br />Appendix L-1 Geogrid Quality Control Certificates <br />Appendix L -2 Geogrid Conformance Test Results <br />• <br />I:Wtlt1MM00\Cert-QRWVC-IOWN1JSIl0.0<00.1]NSCn1PoNCJrc Golder Associates <br />