Laserfiche WebLink
October 2004 -iii- 043-2170 <br />• <br />Table 8 CQA Laboratory Test Summary, Pipe Bedding Material <br />Table 9 CQA Laboratory Test Summary, Structural Fill <br />Table 10 CQA Laboratory Test Summary, Soil Liner Fill <br />Table 11 CQA Laboratory Test Summary, Drain Cover Fill <br />Table 12 CQA Laboratory Test Summary, Fine Shaft Backfill <br />Table 13 Field Density and Moisture Content Test Summary, Phase IVc OSA Soil Liner Fill <br />Table 14 Soil Liner Fill Depth Verification Summary <br />Table 15 Concrete CQA Laboratory Testing Summary <br />Table 16 Field DensiTy and Moisture Content Test Summary, Phase IVc OSA Pipe Bedding <br />Material <br />LIST OF FIGURES <br />Figure 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGSt <br />C~ <br />C~ <br />Drawing 2d Phase IVc Existing Valley Leach Facility Site Conditions Sheet 1 of 2 <br />Drawing 2e Phase IVc Existing Valley Leach Facility Site Conditions Sheet 2 of 2 <br />Drawing 3 Phase IV Site Geology Map <br />Drawing 4 Phase N Site Grading General Plan <br />Drawing Sd Phase IVc Site Grading Plan Sheet 1 of 2 <br />Drawing Se Phase IVc Site Grading Plan Sheet 2 of 2 <br />Drawing 6d Phase Nc Known Underground Workings and Surface Reconnaissance Sheet 1 of 2 <br />Drawing 6e Phase Nc Known Underground Workings and Surface Reconnaissance Sheet 2 of 2 <br />Drawing 7d Phase Nc Remediation Areas and CuUFill Isopach Sheet 1 of 2 <br />Drawing 7e Phase Nc Remediation Areas and Cut/Fill Isopach Sheet 2 of 2 <br />Drawing 8a Phase N Permanent Surface Water Diversion Plan and Profile Sheet 1 of 4 <br />Drawing 9c Phase Nc Site Survey Control Plan <br />Drawing l Od Phase Nc High Volume Solution Collection Piping Layout Sheet 1 of 2 <br />Drawing l0e Phase Nc High Volume Solution Collection Piping Layout Sheet 2 of 2 <br />Drawing I 1 Phase N Valley Leach Facility Cross Sections <br />Drawing 12 Phase IV Underground Working Remediation Details <br />Drawing 13 Phase N Underdrain Details <br />Drawing 14 Phase N Leak Detection and Erosion Control Details <br />Drawing 15 Phase N Surface Water Diversion Details Sheet 1 of 2 <br />Drawing 16 Phase IV Surface Water Diversion Details Sheet 2 of 2 <br />Drawing 17 Phase IV VLF Sections and Details <br />Drawing 24 Phase N High Volume Solution Collection Details <br />`Only drawings relevant to Phase IVc Ore Storage Area construction aze presented. <br />LW~tlI]OWI00\Cert-QMhNCIWi1WR3]0.0100.IENSCu@h1VaJrc Golder Associates <br />