My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -21- 043-2170 <br />• <br /> <br />I • <br />determined from oven-dried samples). The nucleaz density value measured in the field was corrected <br />for coazse particles according to ASTM D4718. Laboratory tests yielded coefficients of permeability <br />for the CQA samples from 1.1 x 10"8 cm/sec to 8.6 x 10-' cm/sec, all of which aze less than the <br />specified maximum permeability of 1 x 10.6 cm/sec. The permeability test results for the SLF are <br />presented in Appendix I-3 and summarized in Table 10. <br />4.1.6 Bulk Specific Gravity <br />Golder conducted two bulk specific gravity tests of SLF at Golder's laboratory in Lakewood, <br />Colorado. Testing was performed in accordance with ASTM C127 for performing rock corrections to <br />the Proctor compaction tests. <br />4.2 Field Testing and Monitoring <br />Golder observed all fill operations in the Phase Nc OSA to verify, when necessary, lifr thickness, <br />adequate compaction, and acceptable moisture conditions. Holes made in the fill during testing were <br />backfilled and tamped with fine SLF. Golder standazdized nuclear gauges at the start of each day's <br />work according to ASTM D2922. <br />4.2.1 Undereround Workings <br />Golder monitored remediation of underground workings, including verification that excavations were <br />performed to minimum required dimensions, and that CP, CR, geogrid, SF, FSB, and SSF were <br />installed as specified. <br />4.2.1.1 Concrete Plug and Cemented RocJ~ll <br />Golder observed placement and testing of CP material used in construction of the Phase Nc OSA. <br />Golder observed and documented testing of approximately 1,604 cubic yazds of concrete for slump, <br />air entrainment, temperature, placement time and compressive strength. Forty-three (43) tests were <br />performed on slump, and 40 tests were performed on compressive strength for a testing frequency of <br />approximately one test per 40 cubic yards. This exceeded the minimum specified testing frequency <br />of one test per every 50 cubic yards. All tests met compressive strength specification. The concrete <br />observation and test results are presented in Appendix H and summarized in Table 15. <br />u~w~xzzow+ao~an~nenrv~-zaonwzvm.waa~wsaneerv~ea Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.