My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-10-18_REVISION - M1980244 (25)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2004-10-18_REVISION - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:54 PM
Creation date
11/22/2007 12:19:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
10/18/2004
Doc Name
Phase IVc Ore Storage Area Liner Certification Report
From
Anglo Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2004 -I1- 043-2170 <br />• IFC Drawing 14, Detail 1 shows a typical Leak Detection Trench Section. Ames excavated the <br />trenches to minimum 1-foot by 1-foot cross-sectional dimensions, and a minimum one percent grade. <br />Ames placed geosynthetics, 4-inch diameter perforated corrugated polyethylene (PCPE} pipe, and <br />LDF in the trench. Ames placed approximately 250 cubic yards of LDF, 19,680 square feet of 40-mil <br />smooth Lineaz Low Density Polyethylene (LLDPE) geomembrane, and 33,000 squaze feet of <br />12-ounce non-woven geotextile in the LDT. The LDT geosynthetics installation is discussed further <br />in Section 3.2. <br />2,4 Site Grading <br />Prior to SF placement, Ames conditioned and compacted the subgrade surface of the fill area. Golder <br />monitored the preparation of the subgade and verified that it met project specifications. <br />Ames graded existing slopes and placed SF so that fmal slopes were no steeper than 2.SH:1 V. Prior <br />to fill placement, the in-situ material was scarified to a depth of approximately 6 inches. SF was <br />compacted with a minimum of four passes by a smooth drum vibratory compactor. <br />• Ames placed approximately 122,500 cubic yards of SF within the Phase Nc OSA for site gading. <br />2.5 Subgrade Preparation <br />Prior to SLF placement, Ames moisture conditioned and compacted the entire surface of the <br />Phase Nc OSA with a smooth drum vibratory compactor. The quality of the surface was then <br />maintained until SLF was placed. <br />2.6 Soil Liner Fill <br />Based on neat-line survey, Ames placed and compacted approximately 96,450 cubic yards of SLF in <br />the Phase IVc OSA. Record Drawing No. 3 in Appendix A presents the as-built surface of the SLF. <br />Ames processed bentonite amended SLF for the Phase Nc OSA construction, beginning in March <br />2004 and finishing in September 2004. Ames worked the borrow material through a custom designed <br />• rotary mill and screen to remove oversized material from the SLF and to uniformly condition the <br /><:m<~znow<oo~c<ngneerv<-<oorw<anro.waau<ucweervce« Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.