Laserfiche WebLink
16. The reclamation plan depicts a lazge pile in the northeast corner of the permit azea to remain after mining is <br />complete. Please be awaze that all piles generated during mining must be adequately reclaimed. Please <br />provide a reclamation plan for the stockpile that meets the standards of Rule 3 and Rule 6. <br />Rule 6.4.7 Exhibit G- Water Infom~ation <br />17. Based on the description of the site, it appears that the applicant will need to obtain a Storm Water <br />Management Plan (SWMP) from the Colorado Department of Public Health and Environment (CDPHE). <br />Attached is a copy of the Colorado Storm Water Program Fact Sheet that you may find useful. <br />Under Rule 3.2(7) the Division is required to conduct an inspection prior to Board consideration. The Division <br />will schedule an inspection prior to the decision date. Additional questions may arise as a result of the inspection. <br />Please be advised that the Brownstone Quarry Conversion Application may be deemed inadequate, and the <br />application may be denied on August 13, 2007 unless the above-mentioned adequacy review items are addressed <br />to the satisfaction of the Division. If you feel more time is needed to complete your reply, the Division can grant <br />an extension to the decision date. This will be done upon receipt of a written waiver of your right to a decision by <br />August 13, 2007 and request for additional time. This must be received no later than the deadline date. <br />If you have any questions, please do not hesitate to call. <br />Sin el , ~ ~~~ <br />C~ <br />Erica Crosby <br />Environmental Protection Speciali <br />Enclosure(s) <br />cc: Carl Mount; DRMS <br />Vic Norris <br />