Laserfiche WebLink
Table 2.05.6-14 has been modified to conform with the 2002 AHR. <br />Questions (regarding text) resulting from review of the reclamation cost estimates: <br />2. Table 2.05.4-4 totals do not add up. <br />Page 2.05-68 has been revised to correct Table 2.05.4-4 <br />4. Coaly yard waste material from the Loadout will be hauled to the nearest pit. <br />Please note that with the current delay in the resumption of mining, the mine plan is being revised. Fitls <br />10-13 will no longer be constructed during the Second Permit term; therefore, CTL Thompson will not be <br />submitting geo-technical information to supplement the permit renewal actions. <br />Please call me if you have any questions, or require additional information. <br />Sincerely, <br />Ron Thompson <br />Enclosures (three sets): <br />2.05-4 <br />2.05-5 <br />2.05-10 <br />2.05-13a <br />2.05-17a <br />2.05-23 <br />2.05-29c <br />2.05-30 <br />2.05-33b <br />2.05-59a <br />2.05-61 <br />2.05-66 <br />2.05-66a <br />2.05-66b <br />2.05-68 <br />2.05-76 <br />2.05-77 <br />2.05-108 <br />5 of 5 <br />