My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98514
DRMS
>
Back File Migration
>
Revision
>
REV98514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:36 AM
Creation date
11/22/2007 12:18:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
5/30/1990
Doc Name
ROCKCASTLE CO GRASSY GAP MINE PN C-81-039
From
PARCEL MAURO HULTIN SPAANSTRA PC
To
MLRD
Type & Sequence
SF1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROCKCASTLE/CMLRD <br />DRAFT AGREEMENT <br />5/30/90 <br />1. Backfill and grade Pit 4 utilizing material in the <br />overburden stockpile in accordance with specifications set forth <br />in the approved Grassy Gap Reclamation Plan as embodied in the <br />Permit (the "Reclamation Plan"). <br />a. If additional overburden material remains in the <br />overburden stockpile after completion of backfilling and grading <br />activities, Rockcastle may leave such additional overburden <br />material in the overburden stockpile upon submission of a technical <br />report demonstrating that the stockpile material will achieve <br />geotechnical and geomorphic stability standards contained in 2 CCR <br />407-2, Rule 4.14.2. <br />2. Replace a minimum of 12 inches of topsoil on disturbed <br />portions of Pit 4 in accordance with the specifications set forth <br />in the Reclamation Plan. <br />3. Reseed disturbed portions of Pit 4 in accordance with the <br />specifications set forth in the Reclamation Plan. All reseeding <br />activities under this Agreement shall use Seed Mix ~3 -- Primary <br />Reclamation, described on page IV-12 of the Permit. <br />4. Remove the shop building adjacent to Pit 4 and retopsoil <br />and reseed the shop and yard areas. Rockcastle will recontour the <br />shop and yard area fill pad as necessary to achieve approximate <br />original contour criteria of 2 CCR 407-2, Rule 4.14.2. <br />5. Undertake such additional reclamation measures as may be <br />mutually agreed upon by Rockcastle and the Division based upon the <br />results of engineering studies conducted by Rockcastle under § IV <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.