Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY ~""°''~~ `'~ <br />Department of Natural Resources <br />RECEIVED <br />~ <br />17135herman 5l., Room 215 : <br /> <br />Denver, Colorado 80203 AUG 17 1995 <br />Phone: 17071866-7567 ~~~ <br />FA%: (7071872-8106 APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT DEPARTMENT' OF <br />Division of Minerals & Geology NATURAL <br /> RESOURCE <br />This form must be completed and submitted with all requests for minor revisions, as defined in Roy Romer <br />Rule 1.04{731, technical revisions, as defined in Rule 1.04136), and permit revisions, as defined cwerrror <br />in Rule 1.041901. All revisions are to address the requirements of Rule 2.08.4. Three (3) copies lames 5. Lochhead <br />of the revision, including maps, must be submitted in order for it to be complete. taecutive Director <br /> Michael B. Long <br /> <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised Division Director <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision <br />submittal date should be printed in the lowe[ right corner of each revision page. A cover le tter to the <br />revision should explain the nature of the revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing <br />list at the same time the application is submitted to the Division, and proof of distribution must be submitted <br />to the Division along with the application. Copies of revision pages modified during the review process must <br />be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. For non-federal mines, a copy of the application for which the <br />Division has issued a proposed approval decision must be submitted to the OSM Albuquerque Field Office <br />(AFOI, and proof of submittal to AFO must be submitted to the Division prior to implementation of the <br />revision. <br />Permit No.: C- 8 1- 0 2 5 Date: 0 8/ 1 4/ 9 5 <br />Perntittee: M I N R E C ~ _ I N C _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br />N O R T H T H O M P S O N C R E E K M I N E S <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - <br />Street: 2 7 6 8_ C O M P A S S_ D R I V E L_ S T E_ 1 0 1_ <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - <br />City: G R A N D _ J U N C T I O N _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br />State: C O Zip Code: 8 1 5 0 6 - _ _ _ _ _ _ _ _ _ _ '_ _ _ <br />Brief Description of Revision: R E V I S E_ T R E A T M E N T_ P O N D_ <br />S P I L L W A Y P I P I N G <br />Public Notice Attached: Yes _ No XX (Required for PR's afld TR's) <br />Bond Increase: Yes _ No xX Federal XX Non-Federal _ Mine <br />Proposed Chauge u7: <br />Disturbed Area (+/-) _ _ 0.0 Acres <br />Permit Area (+/-) _ _ 0.0 Acres <br />Affected Area (+/-) _ _ 0.0 Acres <br />Federal Lattd (+/-) _ _ 0.0 Acres <br />State Land (+/-) _ _ 0.0 Acres Private Land (+/-) _ _ 0.0 Acres <br />