Laserfiche WebLink
<br /> <br />B. L. Pavlik <br />-2- <br />An single open-channel spillway will serve <br />for treatment pond T-1. This open-channel <br />from treatment pond T-1 to pond T-2. <br />August 14, 1995 <br />as the spillway system <br />spillway conveys flow <br />Enclosed is an application for a minor revision to incorporate <br />these changes into the permit. Revised drawing D-2-5 and pond <br />design pages P-9-5 through P-5-10 comprise this minor revision <br />application. Also enclosed is page 2-13 which was revised to <br />update the discussion of the renewed discharge permit. <br />Please call if you have any questions. <br />Sincerely, <br />~~ <br />Jim Stover, P.E. <br />Chief Engineer <br />