Laserfiche WebLink
Trapper Mine 1992 Am• Report (TR-63) • <br />Response to Adequacy Review Comments <br />Page 6 -June, 1993 <br />• <br />Trapper Response: <br />Section 5.0 <br />(~~1.~ As we discussed during the May CDMG partial inspection, this topsoil stockpile location will <br />vU not be used. Other existing and proposed stockpiles will be used to accommodate the topsoil <br />proposed to be placed in this pile. <br />CDMG Cotttment: <br />Section 6.0 -Livestock Tanks <br />The Division is currently discussing the number of livestock tanks constructed and pro- <br />posed with regard to the issue of evaporative loss and water rights. If concerns arise we <br />will notify Trapper tinder separate cover. A statement is made in this section indicating <br />that the SCS or Trapper personnel will inspect livestock ponds for construction adequacy. <br />Please be aware that your approved range management plan requires the SCS to inspect <br />each pond for construction adequacy (p. 3-155). <br />Trapper Response: <br />• Section 6.0. <br />Comments acknowledged. <br />CDMG Comment: <br />Section 7.0 -Miscellaneous <br />1989 Derringer Pit Topsoil Area - No Seed. <br />After the third growing season, it is apparent from review of the data that perennial <br />grasses and fortis as well as shrubs have been slow to establish on this test area. The <br />1993 growing season is the fourth for this area and the Division respectfully reminds <br />Trapper that a commitment was made to evaluate this azea immediately after the fifth <br />growing season (Fall, 1994). These discussions should begin immediately after <br />sample data is collected in the summer of 1994. This will allow interseeding prior to <br />winter if it its deemed necessary. <br />Trapper Res~nse: <br />7.0-1. Reminder respectfully acknowledged. Vegetation data collected for the no-seed area <br />during the current (1993) field season will be evaluated and if no vegetation <br />improvement is detected Trapper may opt to interseed the area prior to fall, 1994. <br />CDMG Comment: <br />• 7.0-2. In the discussion of the waste accumulation facility the statement is trade "Work will <br />be completed in early 1992." Is this correct? Please clarify. <br />